抗震支架裝置進程中有什么留心事宜、What precautions should be taken in the process of anti-seismic bracket installation1、留心裝置進程中應預埋一定的部位 1. Pay attention to reserving a certain position in the process of installation.由于溫度差的變動會造成 抗震支架的管路材料的冷澎漲反映,因而會抗震支架造成一定的偏移,因而在裝置時要預埋一定的部位。而在非常管路中設定抗震支架時理應能操縱間隔,抗震支架生產(chǎn)商著重強調在轉角處務必設定一個鐵架子,相互間的間隔比間隔中間的設計方案懇求理應提升一個抗震支架。Because the change of temperature difference will cause the cold expansion response of pipeline data of seismic bracket, the displacement of seismic bracket will occur, so a certain position should be reserved in the installation. When installing anti-seismic brackets in special pipelines, the spacing should be mastered. The manufacturers of anti-seismic brackets emphasize that a bracket must be installed at the corner. The design requirements of the spacing ratio between the brackets should be added.2、留心裝置進程中的占比設計方案務必有嚴苛的盤算
2. Pay attention to rigorous calculation of proportion design in the process of installation抗震支架生產(chǎn)廠家在裝置時注重,非常是通風風管承載荷指數(shù)需要運用相關規(guī)定的公式計算按如具體情況盤算,由于全部裝置設計方案務必十分科學研究謹嚴,不可以有一切果斷。另外也有自來水管跟金屬軟管相關指數(shù)的取舍跟盤算,抗震支架實體模型跟設計方案務必完畢考試跟校對,務必確定令人滿意懇求才能運用。When installing the anti-seismic bracket, the manufacturer emphasizes that, in particular, the load-bearing coefficient of air duct should be calculated according to the formula of relevant rules according to the actual situation, because all the device design must be superstitious and rigorous, and there can be no arbitrary. At the same time, the selection and calculation of the correlation coefficients of water and metal pipes are also included. The model and design of the anti-seismic bracket must stop checking and checking, and it is necessary to confirm that the application can meet the requirements.